Prep For PracticalityScreen Shot 2017-04-26 at 2.53.37 PM

Once the flooring was removed, they worked on the electric wiring beneath the floor and brought first light to the bus other than the sunlight! It wasn’t just the base that they worked on so far and the real construction was yet on their ways.