Preparing The WiringScreen Shot 2017-04-26 at 3.03.12 PM

Once the inside base was ready to be worked on, Alyssa and Will turned their attention towards the electric prep. It was time to take care of the under-bus bins that were modified. Batteries, vents were installed for the appliances and the front spotlight necessity.